Walnut Creek WWTP Pumping System Improvements

Bids Thursday, 03 October 2019 10:00 AM

Notes

The Work consists of, but not limited to, removal and replacement of five (5) existing

primary sludge pumps, three (3) scum pumps, associated piping and valves; removal and

replacement of eight (8) existing settled wastewater pumps, and associated discharge

piping and valves; removal and replacement of three (3) existing cooling water pumps,

partial replacement of open loop (NPW) piping system, replacement of closed loop piping

system, and rehabilitation of existing heat exchanger; installation of a new portable

emergency generator interconnect for raw water pumping system; replacement of existing

LPU-2, LPU-3 and LPU-4 PLCs and instrumentation and control devices with modern

components inside new modern cabinets; and, installation of new air handling units and air

scrubbers at PTC2 electrical room and Operations Building MCC.

Project Estimator

Bruce A. Matous , Office Phone (254) 780-1400 , Mobile Phone (254) 534-8010

Documents & Files (7)

Location


NOTE: We recommend Google Chrome or Firefox for downloading documents.

These documents are for the purpose of preparing bids for projects. No other use is authorized by Matous Construction. Matous Construction is not the owner or creator of these documents and is not responsible for the completeness or accuracy of them. Bidders must satisfy themselves they have the latest and correct information. Downloading documents & files constitutes proof of agreement to these terms.