Plan Room
Plan Room
NOTE: We recommend Google Chrome or Firefox for downloading documents.
These documents are for the purpose of preparing bids for projects. No other use is authorized by Matous Construction. Matous Construction is not the owner or creator of these documents and is not responsible for the completeness or accuracy of them. Bidders must satisfy themselves they have the latest and correct information. Downloading documents & files constitutes proof of agreement to these terms.
-
Copperas Cove NW WWTP Clarifier Rehabilitation
Project Name: NW WWTP Clarifier Rehabilitation
Owner: City of Copperas Cove
Estimate: $4,385,000.00
Engineer: Strand Associates, Inc.
Bid Date: 10/2/2025 at 2:00 PM
Description:
Replacement of two 85-foot diameter clarifier mechanisms, construction of a new above-grade RAS/WAS (sludge) pumping station, construction of a new submersible clarifier scum pumping station, installation of a new elevated aluminum walkway on the exterior of the clarifiers, and all associated electrical and mechanical work.