These documents are for the purpose of preparing bids for projects. No other use is authorized by Matous Construction. Matous Construction is not the owner or creator of these documents and is not responsible for the completeness or accuracy of them. Bidders must satisfy themselves they have the latest and correct information. Downloading documents & files constitutes proof of agreement to these terms.

  • WMARSS Central WWTP Digester Cleaning and Improvements

    We are requesting quotations from interested subcontractors and suppliers for work associated with the following project:

    Owner: City of Waco

    Project Name: WMARSS Central WWTP Digester Cleaning and Improvements

    Engineer: CDM Smith

    Engineer's Estimate: $7,470,000.00

    Bid Date: August 22, 2024 at 2:00 PM

    Scope:

    The project generally consists of the furnishing of all labor, materials, equipment, appurtenances, and incidentals as required to properly fabricate, construct, inspect and test the construction items required for the removal, screening, and disposal of all accumulated digester contents within three (3) primary digesters and one (1) secondary digester into Sludge Lagoon #3, wash with non-potable water all the tank walls, roof, piping and otherwise prepare the four digesters for inspection, remove and replace the floating gasholder cover complete with pressure relief valves, flame arrestors, access manholes and associated appurtenances on Secondary Digester B, remove and replace various sizes of plug valves in the Digester Pump Station building including pneumatic actuators, modify piping, tank penetrations, and additional plug valves for future improvements, and modify the digester gas piping for Digester B and other work as indicated in the contract documents.

    Documents & Files (4):

  • Park WTP Aeration Tower Removal and Miscellaneous Improvements

    We are requesting quotations from interested subcontractors and suppliers for work associated with the following project:

    Owner: City of Georgetown

    Project Name: Park WTP Aeration Tower Removal and Miscellaneous Improvements

    Engineer: CDM Smith

    Engineer's Estimate: $2,000,000.00

    Bid Date: August 29, 2024 at 2:00 PM

    Scope:

    The project consists of furnishing, installing and providing all labor and materials required for construction of Park Water Treatment Plant (WTP) Aeration Tower Removal and Miscellaneous Improvements including removal of aeration tower, pipe modifications, cleaning and recoating clarifiers, piping and stairway, removal of asphalt pavement, new concrete pavement, swale and grading, and erosion control measures as described in the Drawings and the Summary of Work contained in Section CIP3.

    Documents & Files (3):

     

  • NW WWTP UV Improvements - City of Copperas Cove

    We are requesting quotations from interested subcontractors and suppliers for work associated with the following project:

    Owner: City of Copperas Cove

    Project Name: NW WWTP UV Improvements

    Engineer: Freese & Nichols

    Engineer's Estimate: $2,700,000-3,300,000.00

    Bid Date: September 12, 2024 at 2:00 PM

    Scope:

    Work is described in general, non-inclusive terms as:

    1. Construction of a combined UV disinfection and Parshall flume flow measurement structure,
    2. Installation of inclined UV disinfection system with a treatment capacity of 13.2 MGD and associated equipment,
    3. Installation of a Parshall flume and associated equipment,
    4. Electrical, instrumentation, and controls as necessary for new equipment
    5. Tie-in to existing yard piping and install new piping to redirect existing clarifier effluent through the new structure, and then back into the existing outfall pipe,
    6. Develop, discuss with Owner, and implement maintenance of plant operations plans,
    7. Miscellaneous site improvements including grading around new structure, pavement repair, and reseeding.

    Documents & Files (3):