These documents are for the purpose of preparing bids for projects. No other use is authorized by Matous Construction. Matous Construction is not the owner or creator of these documents and is not responsible for the completeness or accuracy of them. Bidders must satisfy themselves they have the latest and correct information. Downloading documents & files constitutes proof of agreement to these terms.
-
Hornsby Bend Biosolids Management Plant Headworks Improvements
Owner: City of Austin
Engineer: STV, Inc.
Estimate:$24,099,300.00
Bid Date: August 6, 2026 at 2:00pm
Project Description: This construction project generally consists of the following work: demolishing the existing Headworks and constructing a replacement Headworks. The new Headworks will increase screening capacity, provide odor control, & replace critical screening and electrical infrastructure that are severely corroded & unsafe.
Document(s):
- Specifications Volume One
- Specifications Volume Two
- Specification Volume Three
- Specifications Volume Four
- Plans
- Addendum One
- Clarification One
- Addendum Two
- Clarification Two
- Addendum Three
- Clarification Three
- Addendum Four
Proposals at due no later than Tuesday, August 4th at 4:00pm.
-
Hornsby Bend Ammonia Removal Facility And Drainage Improvements
Owner: City of Austin
Engineer: Stantec
Estimate:$31,975,308.00
Bid Date: August 6, 2026
Project Description: The anaerobic digestion process to treat wastewater sludge produces a side stream with high ammonia and nitrogen concentrations. This side stream flow is from the Dewatering Facility which currently discharges directly to the on-site pond system. To treat this high strength ammonia and to meet environmental regulatory requirements a new on-site Ammonia Removal Facility is required. It is projected that this facility will significantly reduce the high ammonia load by 80 to 90%. Improve existing drainage and storm water management systems at Hornsby Bend Biosolids Management Plant. These drainage improvements are required to provide positive drainage for the proposed (future) Ammonia Removal Facility (3164.125). CIP 3164.125 and 3164.094 are being permitted and bid together as one project.
Document(s):
- Specifications Volume One
- Specifications Volume Two
- Specifications Volume Three
- Plans/Drawings
- Addendum One
- Clarification One
- Addendum Two
Proposals at due no later than Tuesday, August 4th at 4:00pm.
-
City of Marlin WTP Improvements, Gravity Filtration System
Owner: City of Marlin
Engineer: MRB Group
Estimate: Not provided
Bid Date: November 18, 2026
Project Description: The project includes demolition of the existing membrane filtration units at the City of Marlin, Texas Water Treatment Plant (WTP) and replacement of these units with a gravity filtration system. Work will be conducted inside the filtration building at the WTP and include two (2) steel gravity filtration vessels, a steel walkway, a skid mounted filtrate pump station, piping modifications, electrical and controls. Improvements to the SCADA Systems and controls and replacement of the backwash pumps are included as allowance items.
Document(s):
Proposals at due no later than Monday, November 16th at 4:00pm.
-
Wilbarger Creek Municipal Utility District No. 2 Wastewater Treatment Plant Expansion to 1.5 MGD
Owner:Wilbarger Creek Municipal Utility District No. 2
Engineer: Quiddity
Estimate: Not provided
Bid Date: November 18, 2026
Project Description: The work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct the Wastewater Treatment Plant Expansion to 1.5 MGD for the Wilbarger Creek Municipal Utility District No. 2 in Travis County, Texas. The work includes rehabilitation, improvements, expansion, and construction at the wastewater treatment plant (WWTP).
The work includes, but is not limited to: demolition and replacement of Lift Station pumps to increase the firm pumping capacity of the lift stations to 2,083 gpm peak two hour flow; installation of a new mechanical screen and washer compactor at the headworks; expansion of the existing peak shaving basin with course bubble aeration; addition of peak shaving pump; construction of Rapid Mix Basin No. 2 with RAS Airlifts; construction of Aeration Basin No. 3 with fine bubble aeration; construction of Clarifier Loading Basin No. 3; construction of Clarifier No. 3 with RAS, WAS, Scum, and Loading Basins; expansion of the Tertiary Filtration system; demolition and replacement of the existing Parshall Flume; Chemical Feed expansion; construction of a Dewatering Facility and press feed pump station; site, grading, drainage, pavement and detention/water quality improvements; and all associated piping, valves, fittings, protective coatings, power, instrumentation, controls, and programming.
Document(s):
Proposals at due no later than Monday, November 16th at 4:00pm.