Plan Room

Plan Room

NOTE: We recommend Google Chrome or Firefox for downloading documents.

These documents are for the purpose of preparing bids for projects. No other use is authorized by Matous Construction. Matous Construction is not the owner or creator of these documents and is not responsible for the completeness or accuracy of them. Bidders must satisfy themselves they have the latest and correct information. Downloading documents & files constitutes proof of agreement to these terms.

  • Hornsby Bend Dewatering Facility and East Stormwater Station

    We are requesting quotations from interested subcontractors and suppliers for work associated with the following project:

    Owner: City of Austin

    Project Name: Hornsby Bend Dewatering Facility and East Stormwater Station

    Engineer: Walker Partners

    Engineer's Estimate: $23,980,000.00

    Bid Date: 4/10/2025

    Scope:

    Replace the existing metal roof and metal siding with fiberglass reinforced plastic panels. Employ a crossflow ventilation system to purge caustic air and upgrade electrical system to support a future, fourth belt press. Upgrade the filtrate line from 12-inch to 16-inch line to accommodate fourth belt press filtrate. 
     

    Documents & Files (6):

  • Temple-Belton Wastewater Treatment Plant Treatment Plant Expansion Phase II

    We are requesting quotations from interested subcontractors and suppliers for work associated with the following project:

    Owner: Cities of Temple and Belton

    Project Name: Temple-Belton Wastewater Treatment Plant Treatment Plant Expansion Phase II

    Engineer: KPA Engineers

    Engineer's Estimate: $68,260,500.00

    Bid Date: 6/3/2025

    Scope:

    This construction project includes the expansion of the Temple-Belton Wastewater Treatment Plant (TBWWTP) including headworks modifications, six million gallons per day (MGD) biological treatment/clarifiers, and 40 MGD disc filters/UV/metering/post-aeration improvements.
     

    Documents & Files (3):