Current Projects
Mission & Vision
Current Projects
-
Project Manager: Andrew W. Roberts , Office Phone 254.780.1400
Documents & Files:
- Vol. 1 of 6 Contract Docs & Technical Specifications
- Vol. 2 of 6 Contract Docs & Technical Specifications
- Vol. 3 of 6 Contract Docs & Technical Specifications
- Vol. 4 of 6 Contract Docs & Technical Specifications
- ROCIP Project Safety Manual
- Plans Drawings Volume 1
- Plans Drawings Volume 2
Location: Click Here for Location Map
Notes:
Work includes the complete construction of expansion of the Wild Horse Ranch WWTP from 0.75 MGD (average daily flow) capacity to 2.25 MGD. The expansion will incorporate biological nutrient removal. Facilities to be constructed or improved include the influent lift station, headworks, aeration basins, secondary clarifiers, disk filters, UV disinfection system, sludge holding tanks and a sludge thickening facility, electrical building and administration building. Included in the project are electrical and instrumentation and controls infrastructure to provide a fully functioning system. A new electrical building and administration building will also be constructed as part of the project.
-
Stillhouse Branch Wastewater Treatment Facility Improvements Phase 1
Project Manager: Mike Psencik, Office Phone: 254.780.1400, Mobile Phone: 254.534.8050
Documents & Files (6):
Location: Click here
-
Dove Springs WWTP Rehabilitation
Project Manager: Blake Pitts , Office Phone 254.780.1400 , Mobile Phone 254.534.1638
Documents & Files:
Location:
-
Daniel's Mountain Pump Station
Project Manager: Mike Psencik , Office Phone 254.780.1400 , Mobile Phone 254.534.8050
Documents & Files:
Location:
-
WMARSS Central WWTP Digester Cleaning and Improvements
Project Manager: Andrew Roberts , Office Phone 254.780.1400
Documents & Files (4):
-
NW WWTP UV Improvements - City of Copperas Cove
Project Manager: Mike Psencik , Office Phone 254.780.1400 , Mobile Phone 254.534.8050
Documents & Files (3):
-
TBWWTP Phase II Expansion
Project Manager: Blake Pitts , Office Phone 254.780.1400 , Mobile Phone 254.534.1638
Documents & Files (1):
This construction project includes the expansion of the Temple-Belton Wastewater Treatment Plant (TBWWTP) including headworks modifications, six million gallons per day (MGD) biological treatment/clarifiers, and 40 MGD disc filters/UV/metering/post-aeration improvements.
-
Hornsby Bend Dewatering Facility and East Stormwater Station
Project Manager: Mike Psencik , Office Phone 254.780.1400 , Mobile Phone 254.534.8050
Documents & Files (6):
This construction project includes the replacement of the existing metal roof and metal siding with fiberglass reinforced plastic panels. Employment of a crossflow ventilation system to purge caustic air and upgrade electrical system to support a future, fourth belt press. Upgrades the filtrate line from 12-inch to 16-inch line to accommodate fourth belt press filtrate.
-
NE WWTP Blowers and Valves - City of Copperas Cove
Project Manager: Mike Psencik and Nate Brooks, Office Phone 254.780.1400 , Mobile Phone 254.534.8050 254.548.2165
Documents & Files (2):
-
Pecan Branch WWTP Package Plant
Project Manager: Blake Pitts , Office Phone 254.780.1400 , Mobile Phone 254.534.1638
Documents & Files (4):
The project consists of furnishing, delivering, installing (welding), commissioning, OWNER training, and providing all labor and materials required for the 2 MGD Pecan Branch Wastewater Treatment Package Plant Equipment and associated improvements, as more fully described in the Drawings and the summary of work contained in CIP 3 and the technical specifications.
-
City of Copperas Cove NW WWTP Clarifier Rehabilitation
Project Manager: Mike Psencik, Office Phone 254.780.1400 , Mobile Phone 254.534.8050
Documents (4):
-
City of Marlin Water Treatment Plant Pre-Filter Screens Replacement
Project Manager: Nate Brooks, Office Phone 254.780.1400 , Mobile Phone 254.548.2165
NOTE: We recommend Google Chrome or Firefox for downloading documents.
These documents are for the purpose of preparing bids for projects. No other use is authorized by Matous Construction. Matous Construction is not the owner or creator of these documents and is not responsible for the completeness or accuracy of them. Bidders must satisfy themselves they have the latest and correct information. Downloading documents & files constitutes proof of agreement to these terms.